Pure Water Monterey

A Groundwater Replenishment Project

Pure Water Monterey
Skip to content
  • Home
  • About Us
    • About Pure Water Monterey
    • Project Benefits
    • Project Technology
  • Reports & Documents
    • Reports & Documents
    • Consolidated Final EIR
    • Final Engineering Report
    • Project Area Maps
  • News
    • Construction Updates
    • News
    • Project News & Announcements
    • In the News
  • FAQs
    • Frequently Asked Questions
    • Additional Questions
    • CEC Information
  • Public Participation
    • Public Participation
    • Meeting Schedule
    • Email List
  • Contact Us

Title 22 Public Hearing Presentation Now Available

Presentation from the August 22, 2016 Title 22 public hearing on the Pure Water Monterey Draft Engineering Report.

PWM – Title 22 Public Hearing Presentation – 08/22/16

This entry was posted in News & Announcements on August 23, 2016 by Steve Thomas.

Post navigation

← Revised Draft Engineering Report Available Revised Pure Water Monterey Engineering Report Released →

Public Hearing

Information from the Public Hearing for Draft Engineering Report (August 22, 2016

Consolidated Final Environmental Impact Report (EIR)

Addendum to the EIR
Addendum to the EIR - Main Body
Compiled Appendices to the Addendum
Notice of Determination


A Consolidated Final EIR is now available.
It contains four volumes:
Volume I : Final text of the EIR document (includes all changes to the Draft EIR)
Volume II: Appendices to the EIR
Volume III: September 2015 Final EIR (contains comments on the Draft EIR and responses to those comments)
Volume IV: EIR Certification and Approval Documents

News & Announcements

  • Visit Construction Updates Page for Info For the latest news and information on the various construction projects associated with Pure Water Monterey, visit our up to date page today! Click Here
  • Pure Water Monterey Wins WateReuse CA Award Pure Water Monterey has been honored with the WateReuse Association of California’s Medium Agency of the Year Award.  The Monterey Peninsula Water Management District (MPWMD)  along with project partner Monterey One Water was presented the award at the Association’s 2018 Annual Conference. The WateReuse Association is a nationally recognized industry advocacy group that promotes the development ...
  • Revised Pure Water Monterey Engineering Report Released With the realization that additional source waters from the Marina Coast Water District were available to bring into the Advanced Water Purification Facility, the Final Pure Water Monterey Engineering Report has been updated to include the expansion of the current 4 Million Gallon per Day (MGD) plant to a 5 MGD plant. Revised Final Pure Water ...

Meetings

Meeting Schedule

Signup for email updates:

Your Name (required)

Your Email (required)


Your ZIP Code (required)


Contact Us

Pure Water Monterey
5 Harris Court, Building G
Monterey, CA 93940

T: (831) 658-5652
F: (831) 644-9560
info@purewatermonterey.org

Join us on:

  • Facebook
  • Twitter
Website Design: Graphicsmith
Copyright: Pure Water Monterey | Sitemap